Close Alert Banner

Build & Invest background image

Skip to Content

City of Kenora Logo

Contact Us
Contact Us
  • Living Here
    • Accessibility and Inclusion
    • Animal Services
    • Building and Renovating
    • Cemetery
    • Childcare and Education
    • Emergency Services and Preparedness
    • Environment
    • Healthcare
    • Libraries
    • Parking
    • Property Taxes
    • Recycling and Garbage
    • Request for Service
    • Roads and Traffic
    • Seniors Services
    • Social Services
    • Transit
    • Utilities
    • Water and Sewer
  • Visit & Play
    • Recreation Centre
    • Admission and Membership
    • Advertising and Sponsorships
    • Amenities
    • Aquatics and Swimming
    • Arenas and Skating
    • Camps
    • Community Organizations
    • Facilities and Rentals
    • Fitness
    • Parking at Arenas
    • Visit Kenora
    • Beaches, Trails and Parks
    • Boating
    • Community Calendar
    • Outdoor Adventure
    • Plan your Trip
    • See and Do
    • Arts and Culture
    • Art Centre
    • Art Organizations
    • Heritage and History
    • Libraries
    • Powwows
    • Museums
    • Volunteer
  • Build & Invest
    • Building and Renovating
    • Business Licences and Permits
    • Community Improvement Plans
    • Current and Active Projects
    • Economic Development
    • Economic Profile and Data
    • Maps
    • Planning and Development
    • Start or Expand Your Business
    • Tenders and Request For Proposals
  • Your Government
    • A-Z Services
    • Accessibility and Inclusion
    • Agenda and Minutes
    • Applications, Licences and Permits
    • Budget and Finances
    • By-laws and Enforcement
    • Committees and Boards
    • Community Flag Raising
    • Elections
    • Freedom of Information
    • Indigenous Relations
    • Jobs
    • Mayor and Council
    • Plans Studies and Reports
    • News and Notices
    • Policies
    • Privacy and Terms
    • Provincial Offences
    • Tenders and Request For Proposals
  • I Want To
    • Apply and Register
    • Building Permits
    • Business Licences and Permits
    • Burning Permits
    • Dog Licences
    • Marriage Licences and Ceremonies
    • Road Permits
    • Pay
    • Bag Tags
    • Fines and Traffic Tickets
    • Ice Candles
    • Parking
    • Property Taxes
    • Water Bill
    • Get Involved
    • Mayor and Council
    • Environment
    • Present to Council
    • Submit a Request for Service
    • Volunteer
    • Work for the City of Kenora
City of Kenora Logo

Building Permit Drawings

Home...Building and RenovatingBuilding PermitsBuilding Permit Drawings
  • Open new window to share this page via Facebook Facebook
  • Open new window to share this page via Twitter Twitter
  • Open new window to share this page via LinkedIn LinkedIn
  • Email this page Email

To ensure the smooth processing of your building permit application with the City of Kenora, you need to include detailed drawings. All projects require a minimum submission of a site plan and drawing. Reviewing the sample drawings will help to ensure that you provide all the necessary information for your building permit.

What drawings do I need?

A complete application for a building permit must be accompanied by the following information:

  • A site plan
  • Architectural and structural drawings (see required drawings chart below)
  • Northwestern Health Unit sewage permit (when applicable)
  • Ministry of Transportation land use permit (when applicable)
  • Regional entrance permit (when applicable)
  • A letter of approval or work permit number from the Ministry of Natural Resources (MNR), and the Department of Fisheries and Oceans (DFO) (when applicable)

The Required Drawings Chart below outlines the drawings required for the noted applications. If your project is not listed, contact the Building Department to determine what drawings are required.

Required drawing chart
Application type Site plan Foundation or basement plan Partial floor plan Complete floor plan Cross section Elevations HVAC design

Single unit dwelling

x

x

 

x

x

x

x

Secondary dwelling unit

x

x

x

x

x

x

x

Addition or renovation

x

x

 

x

x

x

x

Detached garage

x

x

 

x

x

x

 

Carport

x

x

 

x

x

x

 

Porches or decks

x

x

x

 

x

x

 

Stove or fireplaces and chimneys

x

x

x

 

x

x

x

Pool

x

 

 

 

x

 

 

Accessory building

x

x

 

x

x

x

 

Docks and shoreline structures

x

x

 

x

x

x

 

What information is required on each drawing?

View the requirements for each drawing type.

Site plan

The site plan is a drawing based on the property survey. The site plan must show the location of the proposed structure and all existing buildings in relation to the property lines and each other.

The following information should be included on the site plan:

  • Title and scale
  • Street name and number, lot and plan number
  • North arrow
  • Property lines with dimensions
  • Setbacks (measurements from buildings to all property lines)
  • Overall building dimensions
  • Dimension of buildings in relation to each other
  • Right-of-ways and easements
  • Existing and proposed construction
  • Existing and/or proposed septic systems
  • Existing and/or proposed wells
  • Overhead hydro wires

Foundation plan

The foundation plan is a drawing that illustrates the structural components that will support the building, control ground water around the building and forms part of the soil-gas control system.

The following information should be included on all foundation plans:

  • Title and scale
  • Interior and exterior dimensions (including door and window openings)
  • Size and spacing of structural members and lintels
  • Materials used and the extent and size of both new and existing structures
  • Location of cross sections

If you are proposing to use a concrete floating slab foundation for any structure greater than 55 m² (592 ft²) the slab must be designed and sealed by a Structural Engineer.

The Ontario Building Code states in sentence 4.3.4.1(1) that structural steel be designed in accordance with CAN/CSA S16 “limited states design of steel structures”. This engineered design is required to obtain a building permit.

Floor and framing plans

The Building Department requires floor plans for all floors and framing plans when engineering is required. A floor plan is a view from above of the building layout cut approximately 4’ above the walking surface.

The following information should be included on all floor plans:

  • Titles and scale
  • Room names
  • Interior and exterior dimensions (including door and window sizes)
  • Size and spacing of structural members and lintels
  • Location and dimension of stairs (rise and run)
  • Materials used
  • The extent and size of both new and existing structures
  • Type of roof and its framing
  • Location of all plumbing fixtures
  • Location of cross section(s)
  • Sump pump location
Pre-Engineered floor framing or truss drawings must be provided with an application for permit, or prior to the framing inspection. 

Cross section

A cross section is a cut away view of the building from the foundation to the roof. The cross section is required to show the building materials and how they relate to each other.

The following information should be included on the cross section:

  • Title and scale
  • Room names
  • All height dimensions (including floor to ceiling, doors, windows, etc.)
  • Size and type of materials
  • Grade and finish floor elevations

Larger detail drawings may be required to fully show the proposed construction.

Elevations

Elevations show all the outside views of the building. The following information should be included on the elevations:

  • Title and scale
  • Dimensions of the building (height and width)
  • Exterior finishes, materials and fixtures
  • Slope and material of the roof
  • Grade and finished floor/ceiling elevation dimensions

HVAC design

A Heating, Ventilation and Air Conditioning (HVAC) design is required for all new mechanical systems serving each dwelling unit. Some additions may also require a completed HVAC design.

The following information should be submitted as part of the HVAC design:

  • Coordinated floor plans (every level)
  • Heat loss/gain calculations and duct design
  • Equipment specification
  • Ventilation design summary
  • Plumbing fixture location if applicable
  • Energy Efficient Design Summary

Additional drawings and details may be required.

Standard sample drawings

View the standard sample drawings. Please note you must prepare your own drawings. The sample drawings are for reference purposes only.
  • A101 – site plan sample
  • A201 – basement plan sample
  • A202 – ground floor plan sample
  • A301 – north elevation sample
  • A302 – east elevation sample
  • A303 – west elevation sample
  • A401 – section samples
  • Attached garage plan and section samples
  • Attached carport plan and section samples
  • Barrier free ramp plan and section samples
  • Basement walkout plan and section samples
  • Construction specification samples
  • Detached garage plan, section, and detail samples
  • Egress window sample drawing from Milton
  • Schedules samples
  • Wood deck plan and sections samples

Additional resources and forms

Check out these important resources and forms:
  • Cloudpermit
  • Cloudpermit support
  • Building by-law
  • Energy efficiency design summary form
  • Ontario Building Code
  • Ontario Building Code Part 9 housing and small buildings
  • Ontario Building Code Part 10 change of use
  • Ontario Building Code Part 11 renovation
  • OntarioOneCall
  • Road permits
  • Schedule 1 designer information form
  • Vent design summary form
  • Zoning
Build & Invest
  • Building and Renovating
    Toggle Section Building and Renovating Menu
    • Building Permits
      Toggle Section Building Permits Menu
      • Building Permit Drawings
      • Building Permit Guides
        Toggle Section Building Permit Guides Menu
        • Decks and Porches
        • Docks and Shorelines
        • Fences
        • Garages and Accessory Structures
        • New Single Unit Dwellings
        • Secondary Suites
      • Request an Inspection
    • Property Standards
    • Sign Permits
    • Site Plan Control
    • Unorganized Territory Building Requirements
    • Zoning
  • View Full Build & Invest Menu
    Toggle Section
    • Business Licences and Permits
    • Community Improvement Plans
    • Current and Active Projects
    • Economic Development
      Toggle Section Economic Development Menu
      • Economic Profile and Data
        Toggle Section Economic Profile and Data Menu
        • Community Profile
        • Industry Insights
        • Logistics and Accessibility
        • Market Advantages
        • Quality of Life
      • Key Industries
        Toggle Section Key Industries Menu
        • Construction Sector
        • Healthcare Sector
        • Manufacturing Sector
        • Small Business Sector
        • Tourism Sector
      • Locate and Expand
        Toggle Section Locate and Expand Menu
        • Available Land and Properties
        • Planning and Development
        • Property Taxes
      • Meet Team Kenora
      • Programs and Resources
        Toggle Section Programs and Resources Menu
        • Business Licences and Permits
        • Community Improvement Plans
        • Entrepreneurship
        • Partnerships and Associations
        • Small Business Month
      • Official Plan, Zoning By-law, and CIP Review
      • Tourism and Economic Development Strategy
      • Why Kenora
        Toggle Section Why Kenora Menu
        • Local Opportunities
        • Start or Expand Your Business
        • Utilities
        • Working Here
    • Economic Profile and Data
    • Maps
    • Planning and Development
      Toggle Section Planning and Development Menu
      • Community Improvement Plans
      • Condominiums
      • Environmental Site Assessment Request
      • Housing Development
      • Land Division by Consent and Severance
      • Letter of Comfort
      • Minor Variances
      • Official Plan
      • Official Plan, Zoning By-law, and CIP Review
      • Planning Rationale
      • Property and Planning Fees
      • Purchase City Property
      • Secondary Suites
      • Site Plan Control
      • Subdivisions
      • Zoning and Building Compliance Letter
      • Zoning
    • Start or Expand Your Business
    • Tenders and Request For Proposals

Contact Us

Subscribe to Page Updates

City of Kenora footer logo

Your Government
1 Main Street South
Kenora ON P9N3X2
Phone: 807-467-2000

8:00 a.m. to 4:30 p.m.

Monday to Friday

Closed on Holidays

After hours: 807-467-2080



  • A-Z Services
  • Accessibility and Inclusion
  • Contact Us
  • Freedom of Information
  • Sitemap
  • Subscribe
  • Website Feedback
  • Facebook
  • Instagram
  • X
  • Podcast

© 2025 The Corporation of the City of Kenora

Designed by eSolutionsGroup
Close Old Browser Notification
Browser Compatibility Notification
It appears you are trying to access this site using an outdated browser. As a result, parts of the site may not function properly for you. We recommend updating your browser to its most recent version at your earliest convenience.